Parameter confirmation
- deck space, lifting points and package weight
- corrosion, climate and offshore protection requirements
- power, control and platform interfaces
- transport, installation and maintenance access
SJ PETROLEUMOFFSHORE EQUIPMENT
Field notes for Offshore Cementing Equipment: deck space, lifting, corrosion protection and offshore interface requirements before quotation.

| Model | Max. WP MPa(psi) | Max. Displacement L/min(GPM) |
|---|---|---|
| SGJ600-30Q(GJQ100-30) | 97.5(14137) | 3050(794) |
| SGJ600-33Q(GJQ70-30) | 70 (10150) | 3379(893) |
| SGJ600-37Q(GJQ55-35) | 55(7976) | 3767(996) |
| SGJ600-42Q(GJQ45-42) | 45(6526) | 4210(1112) |
| SGJ400-30Q(GJQ75-35) | 75 (10875) | 3504 (806) |
| SGJ400-27Q(GJQ95-27) | 95 (13775) | 2733 (722) |
| SGJ350-30Q(GJQ50-30) | 50 (7251) | 3000(792) |
| SGJ350-25Q(GJQ70-25) | 70(10150) | 2500(660) |
The product has a compact structure, small footprint, convenient lifting and transportation, meets the special requirements of anti-corrosion and explosion-proof operations of offshore platforms, and adapts to cementing operations in oilfields such as ocean, desert, tidal flats and narrow well site operation space.
The available technical data for Offshore Cementing Equipment covers SGJ600-30Q(GJQ100-30), SGJ600-33Q(GJQ70-30), SGJ600-37Q(GJQ55-35), SGJ600-42Q(GJQ45-42), SGJ400-30Q(GJQ75-35). Use these fields to compare the listed configuration with the project duty, site interface and delivery requirements before requesting a final quotation.
Offshore Cementing Equipment is intended for offshore drilling, workover, cementing and platform-based operations. Review the actual well program, site interface and operating environment before approving a final technical configuration.
The current product record provides these technical fields for review: SGJ600-30Q(GJQ100-30), SGJ600-33Q(GJQ70-30), SGJ600-37Q(GJQ55-35), SGJ600-42Q(GJQ45-42), SGJ400-30Q(GJQ75-35). Match the listed values with the required duty point and request confirmation for any interface or operating condition not shown.
Offshore selection must consider hook load, drawworks power, lifting modules, marine corrosion protection, footprint and platform interfaces.
For Offshore Cementing Equipment, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.
For Offshore Cementing Equipment, the supplied sheet covers SGJ600-30Q(GJQ100-30), SGJ600-33Q(GJQ70-30), SGJ600-37Q(GJQ55-35), SGJ600-42Q(GJQ45-42). Confirm the required duty point and operating margin with the project data before purchase.
For Offshore Cementing Equipment, the working environment can change material grade, coating and service life. Confirm the ambient range and exposure conditions before the technical offer is released.
For Offshore Cementing Equipment, the working environment can change material grade, coating and service life. Confirm the ambient range and exposure conditions before the technical offer is released.
For Offshore Cementing Equipment, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the deck space, lifting points and package weight; corrosion, climate and offshore protection requirements; power, control and platform interfaces.
Request product detailsShare the platform constraints, lifting points, power interface and corrosion requirements. We will help confirm the offshore-ready configuration.