Parameter confirmation
- deck space, lifting points and package weight
- corrosion, climate and offshore protection requirements
- power, control and platform interfaces
- transport, installation and maintenance access
SJ PETROLEUMOFFSHORE EQUIPMENT
Field notes for Fixed Platform Workover Rig: deck space, lifting, corrosion protection and offshore interface requirements before quotation.

The upper and lower sliding double-layer substructure which can slide up and down can be longitudinally and horizontally sliding to each wellhead of the cluster well, and the top drive can be installed.
Power drives include diesel engine, DC/AC frequency conversion,hydraulic, hybrid drive, etc.
Guylineless double section mast with telescopic cylinder for easy installation, maintenance and avoidance of drilling vessels in the sea.
Module design is easy to lift.Lightweight and excellent capability.
The structural parts are treated with marine anticorrosive technology such as spraying aluminum and hot dip galvanizing.
Request technical details ?Fixed Platform Workover Rig is intended for offshore drilling, workover, cementing and platform-based operations. Review the actual well program, site interface and operating environment before approving a final technical configuration.
These images are supplied for the same product title and are shown as supporting views for technical review.

Offshore selection must consider hook load, drawworks power, lifting modules, marine corrosion protection, footprint and platform interfaces.
For Fixed Platform Workover Rig, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.
For Fixed Platform Workover Rig, please provide the required duty point, load and interface dimensions so the final rating can be confirmed without assumptions.
For Fixed Platform Workover Rig, the working environment can change material grade, coating and service life. Confirm the ambient range and exposure conditions before the technical offer is released.
For Fixed Platform Workover Rig, the working environment can change material grade, coating and service life. Confirm the ambient range and exposure conditions before the technical offer is released.
For Fixed Platform Workover Rig, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the deck space, lifting points and package weight; corrosion, climate and offshore protection requirements; power, control and platform interfaces.
Request product detailsShare the platform constraints, lifting points, power interface and corrosion requirements. We will help confirm the offshore-ready configuration.