Parameter confirmation
- tubing size and working depth
- injector capacity and reel arrangement
- pressure-control interface
- skid, truck or integrated transport limits
SJ PETROLEUMCOILED TUBING UNITS
Field notes for SLG270 Coiled tubing unit: intervention duty, pressure control, wellhead interface and the support package needed for safe operation.

| Model | SLG50 | SLG180 | SLG270 | SLG360 | SLG450 | SLG620 |
|---|---|---|---|---|---|---|
| Max. pull capacityy (lb/t) | 11000/5 | 40000/18 | 60000/27 | 80000/36 | 100000/45 | 100000/63 |
| Max. snubbing capacityy (Ib/t) | 5500/2.5 | 20000/9 | 30000/13.5 | 40000/18 | 50000/22.5 | 50000/31 |
| Max.speed (m/min) | 60 | 60 | 60 | 60 | 48 | 48 |
| Tubing dia. (in) | 1/4"-1” | 1”-2” | 1”-23/8 | 1 1/4"-31/2 | 1 1/4"-3 1/2 | 2"-4 1/2 |
| Tubing capacityy (or customized)(m) | 3/8"-6000 | 1.5"-4000 | 1.5"-4000 | 2"-5000 | 2"-6600 | 2"-8000 |
| Working pressure (psi/MPa) | 5000/35 | 10000-15000/69-103.5 |
Two trucks or one additional pumping unit with controls integrated into the control cabin of a coiled tubing unit.
The available technical data for SLG270 Coiled tubing unit covers Max. pull capacityy (lb/t), Max. snubbing capacityy (Ib/t), Max.speed (m/min), Tubing dia. (in), Tubing capacityy (or customized)(m). Use these fields to compare the listed configuration with the project duty, site interface and delivery requirements before requesting a final quotation.
conditions.
Injector transported with coils to reduce on-site installation time.
Integrated operation of the crane and hose reel, only 2-3 people needed to accomplish the operation.
Request technical details ?SLG270 Coiled tubing unit is intended for well intervention, cleanout, circulation and remedial operations. Review the actual well program, site interface and operating environment before approving a final technical configuration.
The current product record provides these technical fields for review: Max. pull capacityy (lb/t), Max. snubbing capacityy (Ib/t), Max.speed (m/min), Tubing dia. (in), Tubing capacityy (or customized)(m). Match the listed values with the required duty point and request confirmation for any interface or operating condition not shown.
Compare injector capacity, snubbing capacity, reel size, control system and transport configuration against the intervention program.
For SLG270 Coiled tubing unit, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.
For SLG270 Coiled tubing unit, the available data sheet covers Max. pull capacityy (lb/t), Max. snubbing capacityy (Ib/t), Max.speed (m/min), Tubing dia. (in). Share the job conditions, interface dimensions and delivery location so the configuration can be checked against the project requirement.
For SLG270 Coiled tubing unit, the table above confirms Max. pull capacityy (lb/t): 11000/5 / 40000/18 / 60000/27 / 80000/36 / 100000/45 / 100000/63. Use that figure as the baseline and verify the final duty cycle, safety margin and installation interface before release.
For SLG270 Coiled tubing unit, the configuration must match transport limits, rig-up time, power availability and maintenance access. Confirm the preferred mounting form before final quotation.
For SLG270 Coiled tubing unit, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the tubing size and working depth; injector capacity and reel arrangement; pressure-control interface.
Request product detailsShare the pressure-control requirement, pipe size, wellhead interface and site limits. We will help confirm the right intervention format.