Parameter confirmation
- hook load, working height and wellhead interface
- mast, drawworks and power arrangement
- transport, rig-up and location constraints
- climate, terrain and maintenance conditions
SJ PETROLEUMWORKOVER RIGS
Field notes for Workover Rigs: hook load, mast arrangement, mobility and the workover conditions that shape final equipment selection.

| Model | Nominal hook load kN(lb) | Max. Load kN(Ib) 600(131508) | EnginePowerkW(hp) |
|---|---|---|---|
| 700(151740) | 242(325) | ||
| SXJ350(XJ900) | 600(134880) | 900(1202320) | 287(385) |
| SXJ400(XJ1020) | 800(220304) | 1020(229296) | 335(450) |
| SXJ450(XJ1100) | 800(220304) | 1100(252900) | 354(475) |
| SXJ550(XJ1350) | 1000(264365) | 1350(303480) | 403(540) |
| SXJ650(XJ1600) | 1200(303480) | 1600(330456) | 522(700) |
| SXJ750(XJ1800) | 1500(337200) | 1800(382160) | 403×2(540×2) |
| SXJ1000(XJ2250) | 1800(404640) | 2250(505800) | 470×2(630×2) |
| SXJ2750 | 2250(505800) | 2750(618200) | 485×2(650x2) |
SXJ900DB high-efficiency full-automatic workover operation equipment adopts a new type of vertical self-balancing mast and traveling system with guide rail, and is equipped with a new type of vertical pipe handling system. It upgrades the automatic control system in an all-round way to realize the tubing processing efficiency > 50 jts/hr in workover operation,the automatic operation of sucker rod, and the one-key operation of tubular processing.
The available technical data for Workover Rigs covers SXJ350(XJ900), SXJ400(XJ1020), SXJ450(XJ1100), SXJ550(XJ1350), SXJ650(XJ1600). Use these fields to compare the listed configuration with the project duty, site interface and delivery requirements before requesting a final quotation.
Upright mast without guy line and self-balancing crown block are adopted, and the deflection of loaded crown block is reduced by 80% compared with conventional models.
The traveling block moves with the guide rail of the mast, with small shaking and high efficiency of tubular handover.
The main rig is equipped with 4nos. stepping wellhead centralized devices, which can realize the adjustment of 10 mm level at the wellhead.
Equipped with pipe delivery unit from horizontal to vertical, theefficiency is increased by 20% compared with the conventional.
Sucker rod processing automation, equipped with visual wellhead stage detection system, to improve the tubing handling automation.
Request technical details ?Workover Rigs is intended for well servicing, workover, completion support and intervention operations. Review the actual well program, site interface and operating environment before approving a final technical configuration.
The current product record provides these technical fields for review: SXJ350(XJ900), SXJ400(XJ1020), SXJ450(XJ1100), SXJ550(XJ1350), SXJ650(XJ1600). Match the listed values with the required duty point and request confirmation for any interface or operating condition not shown.
These images are supplied for the same product title and are shown as supporting views for technical review.

Workover selection depends on hook load, mast height, mobility, power source, wellhead clearance, site access and service cycle.
For Workover Rigs, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.
For Workover Rigs, the supplied sheet covers SXJ350(XJ900), SXJ400(XJ1020), SXJ450(XJ1100), SXJ550(XJ1350). Confirm the required duty point and operating margin with the project data before purchase.
For Workover Rigs, the configuration must match transport limits, rig-up time, power availability and maintenance access. Confirm the preferred mounting form before final quotation.
For Workover Rigs, the available data sheet covers SXJ350(XJ900), SXJ400(XJ1020), SXJ450(XJ1100), SXJ550(XJ1350). Share the job conditions, interface dimensions and delivery location so the configuration can be checked against the project requirement.
For Workover Rigs, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the hook load, working height and wellhead interface; mast, drawworks and power arrangement; transport, rig-up and location constraints.
Request product detailsShare the hook load, working height, location access and site power. We will help narrow the workover package before quotation.