Parameter confirmation
- hook load, working height and wellhead interface
- mast, drawworks and power arrangement
- transport, rig-up and location constraints
- climate, terrain and maintenance conditions
SJ PETROLEUMWORKOVER RIGS
Field notes for Ten thousand meter ultra deep well workover rig: hook load, mast arrangement, mobility and the workover conditions that shape final equipment selection.

Only four (4) loads are needed for main rig movement to significantly improve the efficiency of installation and commissioning within 6 hours. Currently, it has completed the deep-well complicated operations like Wells SHB5-5H and 5-4, with a maximum drilling depth of 8500m, totaling 35 trips of tripping in and out operations.
These workover rigs have been put into operation at Sinopec "Shendi Well 1" in Xinjiang Shunbei Oil and Gas Field since September 2023.
The workover rig packages are field proven, a testimony of durability, reliability and high efficiency you can account on.
Request technical details ?Ten thousand meter ultra deep well workover rig is intended for well servicing, workover, completion support and intervention operations. Review the actual well program, site interface and operating environment before approving a final technical configuration.
Workover selection depends on hook load, mast height, mobility, power source, wellhead clearance, site access and service cycle.
For Ten thousand meter ultra deep well workover rig, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.
For Ten thousand meter ultra deep well workover rig, please provide the required duty point, load and interface dimensions so the final rating can be confirmed without assumptions.
For Ten thousand meter ultra deep well workover rig, the configuration must match transport limits, rig-up time, power availability and maintenance access. Confirm the preferred mounting form before final quotation.
The supplied product material does not state a final value for this question. Provide the well conditions, interface dimensions, operating environment and delivery location so the Ten thousand meter ultra deep well workover rig configuration can be confirmed without assumptions.
For Ten thousand meter ultra deep well workover rig, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the hook load, working height and wellhead interface; mast, drawworks and power arrangement; transport, rig-up and location constraints.
Request product detailsShare the hook load, working height, location access and site power. We will help narrow the workover package before quotation.