WORKOVER RIGS

full automatic Workover Rigs

Field notes for full automatic Workover Rigs: hook load, mast arrangement, mobility and the workover conditions that shape final equipment selection.

full automatic Workover Rigs
Workover Rigs

Technical profile

SXJ900DB high-efficiency full-automatic workover operation equipment adopts a new type of vertical self-balancing mast and traveling system with guide rail, and is equipped with a new type of vertical pipe handling system. It upgrades the automatic control system in an all-round way to realize the tubing processing efficiency > 50 jts/hr in workover operation,the automatic operation of sucker rod, and the one-key operation of tubular processing.

Upright mast without guy line and self-balancing crown block are adopted, and the deflection of loaded crown block is reduced by 80% compared with conventional models.

The traveling block moves with the guide rail of the mast, with small shaking and high efficiency of tubular handover.

The main rig is equipped with 4nos. stepping wellhead centralized devices, which can realize the adjustment of 10 mm level at the wellhead.

Equipped with pipe delivery unit from horizontal to vertical, theefficiency is increased by 20% compared with the conventional.

Sucker rod processing automation, equipped with visual wellhead stage detection system, to improve the tubing handling automation.

Workover Rigsfull automatic Workover Rigsoilfield equipmentfield service
Request technical details ?
Specification review

Confirm the workover rig equipment duty for full automatic Workover Rigs before quotation.

full automatic Workover Rigs is intended for well servicing, workover, completion support and intervention operations. Review the actual well program, site interface and operating environment before approving a final technical configuration.

Parameter confirmation

  • hook load, working height and wellhead interface
  • mast, drawworks and power arrangement
  • transport, rig-up and location constraints
  • climate, terrain and maintenance conditions

Configuration selection

  • mast and substructure selected around the workover program
  • drive and control package matched to site power
  • truck, trailer or modular arrangement reviewed
  • wellhead and auxiliary systems coordinated
Engineering context

What to confirm before quotation.

Workover selection depends on hook load, mast height, mobility, power source, wellhead clearance, site access and service cycle.

Mobile Workover ServiceCompare truck, trailer, skid or integrated layouts against transport limits, rig-up time and available utilities.
Desert And Remote FieldsConfirm temperature, altitude, corrosion exposure, access and maintenance conditions before freezing the specification.
Battery, Electric And Conventional Drive OptionsConfirm temperature, altitude, corrosion exposure, access and maintenance conditions before freezing the specification.
Quality and documentation

Request the workover evidence package for full automatic Workover Rigs.

For full automatic Workover Rigs, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.

Quality review

  • Confirm the inspection points, test scope and acceptance documents applicable to the ordered configuration.

Technical materials

  • Request the workover rig datasheet for this model.
  • Request the GA and transport drawing for this model.
  • Request the mast and drawworks configuration list for this model.

Delivery readiness

  • Confirm package dimensions, lifting or transport requirements, installation interfaces and the documents supplied with delivery.
Buyer questions

Questions to settle before purchase.

What hook load and mast height are required?

For full automatic Workover Rigs, please provide the required duty point, load and interface dimensions so the final rating can be confirmed without assumptions.

Which drive and transport configuration fits the site?

For full automatic Workover Rigs, the configuration must match transport limits, rig-up time, power availability and maintenance access. Confirm the preferred mounting form before final quotation.

What automation or energy-storage option is needed?

The supplied product material does not state a final value for this question. Provide the well conditions, interface dimensions, operating environment and delivery location so the full automatic Workover Rigs configuration can be confirmed without assumptions.

Direct inquiry

Send the full automatic Workover Rigs requirement.

For full automatic Workover Rigs, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the hook load, working height and wellhead interface; mast, drawworks and power arrangement; transport, rig-up and location constraints.

Request product details
Configuration support

Need a different workover mast or transport form for full automatic Workover Rigs?

Share the hook load, working height, location access and site power. We will help narrow the workover package before quotation.