Parameter confirmation
- hook load, working height and wellhead interface
- mast, drawworks and power arrangement
- transport, rig-up and location constraints
- climate, terrain and maintenance conditions
SJ PETROLEUMWORKOVER RIGS
Field notes for Free standing Workover Rig: hook load, mast arrangement, mobility and the workover conditions that shape final equipment selection.

Integrated automatic operation device: unmanned tubing tripping at the wellhead, reducing the number of operators per shift from 5-6 to 2.
H-mast, without guyline. No need of ground anchor, faster rigging-upand rigging-down, mechanized tools.
Multi-stage rotary operation cabin, comfortable operation and good visibility for the driller.
Integrated management system for rig power: meeting the requirements for hydraulic, air and electric power supply for rig adjustment, operation and mechanized tools, without the need for additional power.
Job data acquisition, storage, and wireless transmission.
Request technical details ?Free standing Workover Rig is intended for well servicing, workover, completion support and intervention operations. Review the actual well program, site interface and operating environment before approving a final technical configuration.
Workover selection depends on hook load, mast height, mobility, power source, wellhead clearance, site access and service cycle.
For Free standing Workover Rig, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.
For Free standing Workover Rig, please provide the required duty point, load and interface dimensions so the final rating can be confirmed without assumptions.
For Free standing Workover Rig, the configuration must match transport limits, rig-up time, power availability and maintenance access. Confirm the preferred mounting form before final quotation.
The supplied product material does not state a final value for this question. Provide the well conditions, interface dimensions, operating environment and delivery location so the Free standing Workover Rig configuration can be confirmed without assumptions.
For Free standing Workover Rig, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the hook load, working height and wellhead interface; mast, drawworks and power arrangement; transport, rig-up and location constraints.
Request product detailsShare the hook load, working height, location access and site power. We will help narrow the workover package before quotation.