Parameter confirmation
- pressure, displacement and duty cycle
- fluid type and suction or discharge arrangement
- drive, skid and transport configuration
- maintenance access and spare-parts requirements
SJ PETROLEUMPUMPING UNIT
Field notes for Drilling Mud Pump: application duty, configuration logic and the operating conditions that matter before RFQ.

| Model | STP1600ML | SQP2200M | SQP2800M |
|---|---|---|---|
| Rated input | 1600(1193) | 2200(1641) | 2800 n.c. |
| power hp(kW) | |||
| Rated stroke-1/min | 120 | 135 | 107 |
| Stroke in. (mm) | 12"(304.8) | 12"(304.8) | 304.8 |
| Max.rated | 39.9 (7" Liner) | 97.7 (7.5" Liner) | 69.2(7" Liner) |
| displacement L/s | |||
| Max. WP MPa | 51.7(5" Liner) | 51.8 (4" Liner) | 51.7(5" Liner) |
| LxWxH mm | 6000×2675x2882 | 8025×3673×2929 | 6000×3487×2935 |
| Pump weight t | 28 | 66 | 42 (w/o charging |
| system) |
To meet the requirements of high formation pressure in ultra-deep Wells and efficiency drilling speed, STP1600M and STP2200M high pressure drilling pumps have been developed to effectively improve the processing capacity of solid control system.
The available technical data for Drilling Mud Pump covers Rated input, power hp(kW), Rated stroke-1/min, Stroke in. (mm), Max.rated. Use these fields to compare the listed configuration with the project duty, site interface and delivery requirements before requesting a final quotation.
Capture the long stroke, low SPM and L-shape fluid end, manifold forging technology, improve the service life of high pressure drillingpump and pressure resistance.
Combined with the operating conditions of in-service drilling pump,optimize the structure, upgrade the material, improve the performance of supporting accessories and consumable parts.
Request technical details ?Drilling Mud Pump is intended for fluid transfer, drilling circulation, cementing and stimulation support. Review the actual well program, site interface and operating environment before approving a final technical configuration.
The current product record provides these technical fields for review: Rated input, power hp(kW), Rated stroke-1/min, Stroke in. (mm), Max.rated. Match the listed values with the required duty point and request confirmation for any interface or operating condition not shown.
Pump selection should match pressure, displacement, fluid type, stroke, power source, maintenance access and supporting manifolds.
For Drilling Mud Pump, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.
For Drilling Mud Pump, the table above confirms displacement L/s: / / . Use that figure as the baseline and verify the final duty cycle, safety margin and installation interface before release.
For Drilling Mud Pump, the configuration must match transport limits, rig-up time, power availability and maintenance access. Confirm the preferred mounting form before final quotation.
For Drilling Mud Pump, the configuration must match transport limits, rig-up time, power availability and maintenance access. Confirm the preferred mounting form before final quotation.
For Drilling Mud Pump, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the pressure, displacement and duty cycle; fluid type and suction or discharge arrangement; drive, skid and transport configuration.
Request product detailsShare the operating conditions and delivery constraints. We will help confirm the most practical equipment layout.