FRACTURING EQUIPMENT

Fracturing Manifolds Truck

Field notes for Fracturing Manifolds Truck: pressure duty, pumping package, blending arrangement and the operating limits that drive selection.

Fracturing Manifolds Truck

Product parameters

ModelMax. working pressure MPa(psi)Power of engine kW(hp)
SYL3000Q-140(3000)140(20000)2350(3150)
SYL3000-140(3000)140(20000)2350(3150)
SYL2500Q-140(2500)140(20000)2235(3000)
SYL2300Q-140(2500A)140(20000)1860(2500)
SYL2000Q-105(2000)105(15000)1680(2250)
SYL2000-105(2000)105(15000)1680(2250)
SYL1600-105(1600)105(15000)1320(1800)
SYL1300-105(1300)105(15000)1120(1500)
SYL1000-105(1000)99.5(14426)1040(1400)
SYL900-70(900)70(10000)845(1135)
Fracturing Equipment

Technical profile

The high-pressure manifold adopts a 4"main path, which can connect 8-10 fracturing pump equipment.

At a glance

Key specifications

SYL3000Q-140(3000)140(20000) / 2350(3150)
SYL3000-140(3000)140(20000) / 2350(3150)
SYL2500Q-140(2500)140(20000) / 2235(3000)
SYL2300Q-140(2500A)140(20000) / 1860(2500)

The available technical data for Fracturing Manifolds Truck covers SYL3000Q-140(3000), SYL3000-140(3000), SYL2500Q-140(2500), SYL2300Q-140(2500A), SYL2000Q-105(2000). Use these fields to compare the listed configuration with the project duty, site interface and delivery requirements before requesting a final quotation.

Pressure grade 105/140MPa.

The low-pressure manifold adopts a large diameter direct connection structure to avoid sand settling and reduce friction.

Optional straight arm and folding arm cranes can be used, hydraulic auxiliary support can effectively prevent rollover.

Fracturing EquipmentFracturing Manifolds Truckoilfield equipmentfield service
Request technical details ?
Specification review

Confirm the fracturing equipment duty for Fracturing Manifolds Truck before quotation.

Fracturing Manifolds Truck is intended for well stimulation, fracturing fluid delivery and continuous mixing support. Review the actual well program, site interface and operating environment before approving a final technical configuration.

Parameter confirmation

  • working pressure and required displacement
  • pump, blending and manifold arrangement
  • fluid, proppant and additive handling
  • continuous duty, power and transport limits

Configuration selection

  • pump configuration matched to pressure and displacement duty
  • sand blending, additive and manifold interfaces reviewed as a package
  • electric, truck or skid arrangement checked against site power
  • fluid-end and maintenance access confirmed

The current product record provides these technical fields for review: SYL3000Q-140(3000), SYL3000-140(3000), SYL2500Q-140(2500), SYL2300Q-140(2500A), SYL2000Q-105(2000). Match the listed values with the required duty point and request confirmation for any interface or operating condition not shown.

Engineering context

What to confirm before quotation.

Pressure, displacement, duty cycle, power utilization, noise, sand rate and control architecture should be reviewed together.

Shale And Tight-Gas StimulationMatch pumping rate, treatment pressure and chemical compatibility to the intervention program.
Large-Platform Multi-Well OperationsCheck platform footprint, lifting points, marine protection and interface responsibilities with the project team.
Electric Fracturing And Sand BlendingConfirm temperature, altitude, corrosion exposure, access and maintenance conditions before freezing the specification.
Quality and documentation

Request the fracturing evidence package for Fracturing Manifolds Truck.

For Fracturing Manifolds Truck, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.

Quality review

  • Confirm the inspection points, test scope and acceptance documents applicable to the ordered configuration.

Technical materials

  • Request the fracturing equipment datasheet for this model.
  • Request the fluid-end and manifold configuration sheet for this model.
  • Request the GA drawing for this model.

Delivery readiness

  • Confirm package dimensions, lifting or transport requirements, installation interfaces and the documents supplied with delivery.
Buyer questions

Questions to settle before purchase.

What pressure and displacement are needed for the stimulation program?

For Fracturing Manifolds Truck, the supplied sheet covers SYL3000Q-140(3000), SYL3000-140(3000), SYL2500Q-140(2500), SYL2300Q-140(2500A). Confirm the required duty point and operating margin with the project data before purchase.

Is electric, diesel, truck, trailer or skid-mounted equipment preferred?

For Fracturing Manifolds Truck, the configuration must match transport limits, rig-up time, power availability and maintenance access. Confirm the preferred mounting form before final quotation.

What sand transport and continuous mixing capacity is required?

For Fracturing Manifolds Truck, the supplied sheet covers SYL3000Q-140(3000), SYL3000-140(3000), SYL2500Q-140(2500), SYL2300Q-140(2500A). Confirm the required duty point and operating margin with the project data before purchase.

Direct inquiry

Send the Fracturing Manifolds Truck requirement.

For Fracturing Manifolds Truck, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the working pressure and required displacement; pump, blending and manifold arrangement; fluid, proppant and additive handling.

Request product details
Configuration support

Need a different fracturing layout or pumping package for Fracturing Manifolds Truck?

Share the pressure target, displacement, blending arrangement and transport limit. We will help confirm the right stimulation package.