CEMENTING EQUIPMENT

SGJ350 25 Twin pump cementing truck

Field notes for SGJ350 25 Twin pump cementing truck: working pressure, displacement, slurry handling and the configuration choices that affect cementing performance.

SGJ350 25 Twin pump cementing truck

Product parameters

ModelMax. WP MPa(psi)Max. Displacement L/min(GPM)
SGJ350-13(GJC50-13)50(7252)1376(362)
SGJ350-17(GJC40-17)40(5800)1641(434)
SGJ350-25(GJC70-25)70(10153)2473(653)
SGJ350-30(GJC50-30)50(7252)2866(757)
Cementing Equipment

Technical profile

SGJ350 25 Twin pump cementing truck is configured for cement placement, slurry mixing and well construction under pressure. Final selection should be based on the operating envelope, required capacity, mounting form and site conditions.

At a glance

Key specifications

SGJ350-13(GJC50-13)50(7252) / 1376(362)
SGJ350-17(GJC40-17)40(5800) / 1641(434)
SGJ350-25(GJC70-25)70(10153) / 2473(653)
SGJ350-30(GJC50-30)50(7252) / 2866(757)

The available technical data for SGJ350 25 Twin pump cementing truck covers SGJ350-13(GJC50-13), SGJ350-17(GJC40-17), SGJ350-25(GJC70-25), SGJ350-30(GJC50-30). Use these fields to compare the listed configuration with the project duty, site interface and delivery requirements before requesting a final quotation.

Cementing EquipmentSGJ350 25 Twin pump cementing truckoilfield equipmentfield service
Request technical details ?
Specification review

Confirm the cementing equipment duty for SGJ350 25 Twin pump cementing truck before quotation.

SGJ350 25 Twin pump cementing truck is intended for cement placement, slurry mixing and well construction support. Review the actual well program, site interface and operating environment before approving a final technical configuration.

Parameter confirmation

  • working pressure and displacement
  • slurry density and mixing arrangement
  • truck, trailer or skid mounting
  • power source and site access

Configuration selection

  • pump arrangement matched to the cementing program
  • mixing and additive handling reviewed with the slurry design
  • transport or skid integration checked against the site interface
  • power and control connections confirmed

The current product record provides these technical fields for review: SGJ350-13(GJC50-13), SGJ350-17(GJC40-17), SGJ350-25(GJC70-25), SGJ350-30(GJC50-30). Match the listed values with the required duty point and request confirmation for any interface or operating condition not shown.

Engineering context

What to confirm before quotation.

Selection should start with working pressure, displacement, slurry density control, mounting form and the available power source.

Primary CementingConfirm slurry density, displacement and zonal isolation so the cement program matches the well objective.
Deep And High-Pressure WellsMatch rated pressure and displacement to the job program, fluid properties and required duty cycle.
Long Horizontal And Loss-Prone FormationsCheck placement efficiency, fluid-loss control and circulation stability before freezing the package.
Quality and documentation

Request the cementing evidence package for SGJ350 25 Twin pump cementing truck.

For SGJ350 25 Twin pump cementing truck, quality and delivery review should be tied to the final configuration rather than general claims. Ask for the applicable inspection scope, dimensional information, test records and supplied documentation before purchase approval.

Quality review

  • Confirm the inspection points, test scope and acceptance documents applicable to the ordered configuration.

Technical materials

  • Request the cementing equipment datasheet for this model.
  • Request the GA drawing for this model.
  • Request the pump and mixing configuration sheet for this model.

Delivery readiness

  • Confirm package dimensions, lifting or transport requirements, installation interfaces and the documents supplied with delivery.
Buyer questions

Questions to settle before purchase.

What working pressure and displacement are required for this cementing job?

For SGJ350 25 Twin pump cementing truck, the supplied sheet covers SGJ350-13(GJC50-13), SGJ350-17(GJC40-17), SGJ350-25(GJC70-25), SGJ350-30(GJC50-30). Confirm the required duty point and operating margin with the project data before purchase.

Which truck, trailer or skid-mounted configuration is suitable?

For SGJ350 25 Twin pump cementing truck, the configuration must match transport limits, rig-up time, power availability and maintenance access. Confirm the preferred mounting form before final quotation.

Can the unit be configured for high-temperature or desert operations?

For SGJ350 25 Twin pump cementing truck, the working environment can change material grade, coating and service life. Confirm the ambient range and exposure conditions before the technical offer is released.

Direct inquiry

Send the SGJ350 25 Twin pump cementing truck requirement.

For SGJ350 25 Twin pump cementing truck, include the model, application, required duty, quantity and delivery destination. For a faster technical response, also include the working pressure and displacement; slurry density and mixing arrangement; truck, trailer or skid mounting.

Request product details
Configuration support

Need a different cementing pressure or displacement package for SGJ350 25 Twin pump cementing truck?

Share the working pressure, displacement, slurry design and mounting preference. We will help confirm the most suitable cementing configuration.